Illinois roofing: permits, codes and approvals

IDFPR limited and unlimited roofing licenses, the Home Repair and Remodeling Act brochure and contract rules, insurance-claim cancellation and storm-repair limits, city re-roof permits, and mechanics lien deadlines.

1 · Product approvals

Product approvals

Illinois has no statewide roofing product approval system. Local building officials rely on the code's labeling requirements and evaluation reports (ICC-ES, UL, FM). Chicago adds its own solar reflectance rules for roofs (Chicago Building Code Section 1515).

2 · Permit forms

City re-roof permits

No statewide re-roof permit rule; each city or county decides. Many Illinois cities ask for the roofer's state license number on the permit, and permit offices must record it.

3 · Code rules

Code rules

Since January 1, 2025 (Public Act 103-0510), local codes must be at least as stringent as the IRC for residential structural design; where there's no local code, the current or immediately preceding IRC applies. The Illinois Energy Conservation Code applies statewide. Official adoption page ↗

4 · Wind, fire and storm programs

Wind, fire and storm programs

No state FORTIFIED grant or roof insurance-discount mandate was found. The main storm rules are in the Home Repair and Remodeling Act's damaging-weather section, which limits what contractors can do on insurance jobs.

5 · License and insurance

License and insurance

Yes. Illinois licenses roofing contractors through IDFPR under the Roofing Industry Licensing Act. A limited license covers residential work; an unlimited license covers residential, commercial and industrial.

6 · Lien and contract forms

Lien and contract rules

Roofing contracts need a signed written contract with a 72-hour cancellation clause, the state consumer-rights brochure, and an insurance-claim cancellation notice. Contractors record a lien within 4 months of completion to protect it against third parties.

Roofing contract contents (225 ILCS 335/5.5)Before work starts, give a written contract signed by both sides with scope, materials, dates, costs, full contact info and your surety and liability insurer. It must let the owner cancel within 72 hours for a full deposit refund.Consumer rights brochure (815 ILCS 513/20)Give every customer the "Home Repair: Know Your Consumer Rights" pamphlet. For jobs over $1,000, hand it over before the contract is signed and get the signed Consumer Rights Acknowledgment Form.Written contract over $1,000 (815 ILCS 513/15)Home repair work over $1,000 needs a signed written contract or work order showing total cost, itemized parts and materials, any estimate charge, and the business name and address.Insurance-claim cancellation (815 ILCS 513/18)On jobs paid by insurance, the owner can cancel until midnight of the earlier of 5 business days after a claim denial or 30 business days after the insurer gets proof of loss. The contract needs a bold notice and a detachable cancellation form; refund within 10 days.Owner-occupied home notice and sworn statement (770 ILCS 60/5)Before taking the first payment on an owner-occupied single-family home, give the owner a 10-point bold notice that the contractor must provide a sworn statement of everyone supplying labor and materials.Subcontractor notice: 90 days (770 ILCS 60/24)Subcontractors and suppliers must serve written notice on the owner (and lender, if known) within 90 days after completing their work, by certified or registered mail, tracked delivery or personal service.Lien recording: 4 months (770 ILCS 60/7)Record the lien claim or sue within 4 months after completion to enforce it against other creditors and buyers. Against the owner alone, the claim can be filed within 2 years of completion.

Install instructions by brand: all makers →

Public records, last checked Oct 23, 2026. Always verify on the official source before you permit.